Questions for the NDRCHS Neighborhood Meeting on 11/19/2026, 6pm, at Sacred Heart Parish Hall
These questions are provided to help you think through the issues that concern you, and help you formulate questions you want to ask at the community meeting.
1. Permit Process and Zoning
1. Original 1960 Permit Scope: "The 1960 permit allowed a parish community hall, not a school. On what basis does the school see a daily high school as the same kind of use?" (BMC 20.16.010; BMC 20.16.020)
2. Exemption vs. Permit Review: "A school in a residential single zone needs a Type III-A conditional use permit, and a Hearing Examiner decides whether to grant it. Why did the school first ask for an exemption from that process?" (BMC 20.16.020(L)(1); BMC 20.30.020)
3. Hearing Examiner Review: "After this meeting, the school will apply for a conditional use permit, and the Hearing Examiner will hold a public hearing to decide whether to grant it. What will you present at that hearing to show the school will not harm the neighborhood?" (BMC 20.16.020(L)(1))
4. Church vs. School Use: "The application describes the school as similar to the existing church use. How do you compare occasional weekend gatherings to a full-time, four-day-a-week regional high school?" (BMC 20.16.010; BMC 20.30.020)
5. "Existing Classrooms": "The exemption request describes the project as converting existing classrooms. Our records suggest those rooms were used for periodic religious meetings. What documents show they were used as classrooms?" (BMC 20.16.020)
6. Benefit to the Neighborhood: "The city code looks for changes that improve the plan for both the use and the neighborhood. Beyond benefits to the Archdiocese, what would South Hill gain from this project?" (BMC 20.16.010.1)
2. Comprehensive Plan and Neighborhood Plan
7. Protecting Residential Character: "The Comprehensive Plan calls for protecting residential character and allowing only compatible institutional uses. How does a regional high school drawing from five counties fit that goal?" (Comprehensive Plan Policy LU-1)
8. Scale and Adverse Impacts: "Conditional uses are expected to match the surrounding scale without adding noise, light, or traffic problems. What will you do to prevent those impacts for immediate neighbors?" (Comprehensive Plan Policy LU-7)
9. South Hill Neighborhood Plan: "The South Hill Neighborhood Plan asks that site and building design limit noise, lighting, refuse, and privacy impacts. What operational guidelines are planned for refuse, bell and activity noise, and evening lighting?" (South Hill Neighborhood Plan, Area 4A)
10. Comprehensive Plan Response: "When asked how the project fits the Comprehensive Plan, the application did not respond. Will you address that now?" (COB Comprehensive Plan, Land Use Element)
3. Building Suitability and Site
11. Science Labs and Chemical Storage: "A high school typically needs science labs and hazardous chemical storage. What fire, ventilation, and safety upgrades will a 1960 parish hall need?" (International Building Code; International Fire Code)
12. Scope of Renovations: "What is the dollar value and structural scope of the planned renovations? Will they trigger upgrades such as ADA accessibility, window or door replacement, kitchen or restroom upgrades, or seismic retrofitting?" (BMC building code; ADA)
13. Open Space Requirement: "Residential single zones are expected to keep a minimum share of the lot, typically 30 percent, free of buildings and paving to protect light, air, and privacy. What percentage of the Sacred Heart site is open space today, and how was it calculated?" (BMC 20.12.010; BMC 20.30.040)
14. Existing Coverage: "The church, the parish hall, the parking areas, and other structures already cover much of the lot, so the site appears to fall short of the open-space requirement. How will the school address that while adding a daily student body?" (BMC 20.12.010; BMC 20.30.040)
15. Temporary Structures: "Does the plan include any temporary classrooms, modular units, or other new structures on the lot or other church property? If so, adding structures to a site that is already short on open space can expand the nonconformity. Will you seek a variance or address it through the conditional use permit, and how will the structures affect lot coverage, setbacks, and stormwater drainage?" (BMC 20.12.010; BMC 20.30.040)
4. Intensity of Use and Occupancy
16. Total Occupancy: "The school's target enrollment is 24 students in Year 1 and 49 students in Year 2. How many people will be on site once you count staff, maintenance, and visitors?" (BMC 20.16.010; BMC 20.30.020; BMC Building and Occupancy Codes)
17. Shared Use With the Church: "Sacred Heart plans to keep weekly access to major parts of the building while school is in session. What occupancy maximum has the Fire Department set, and how will you keep the shared usage from exceeding it?" (BMC Building and Occupancy Codes)
18. Four-Year Projections and Hours: "The school has projected 24 students in Year 1 and 49 in Year 2, but nothing beyond that. What are the expected numbers of students, staff, and visitors for Year 3 and Year 4? What will the daily school hours be?" (SEPA Environmental Checklist)
5. Traffic, Pedestrian Safety, and Infrastructure
19. Trip Estimates: "National estimates suggest 24 students could generate 50 to 100 vehicle trips a day. What data do you have on expected trips, and how will they change when enrollment reaches 49 in Year 2?" (SEPA Environmental Checklist)
20. Bus Routes and Drop-Off: "Students will travel from five counties, so few will walk. What are the planned bus routes, drop-off zones, and staging areas, and how will larger vehicles use narrow South Hill streets?" (BMC 20.16.020; COB Public Works Standards)
21. Lowell Elementary Overlap: "The site is one block from Lowell Elementary. Has a joint traffic study looked at the combined effect of two schools' drop-off and pick-up peaks?" (SEPA cumulative impact review)
22. Sidewalks and Crosswalks: "Nearby streets lack continuous sidewalks and crosswalks. Will the school fund curbs, gutters, and sidewalks along its frontage as a condition of its permit?" (COB Public Works Standards; WSDOT Guidelines)
23. Crossing Between Buildings: "Students will cross streets between the school, the church, and the parking lot, with no painted crosswalks. How many crossings do you expect each day, and how will you keep students safe?" (COB Public Works Standards; WSDOT Guidelines)
24. Right-of-Way Conditions: "Question 10 of the application reports no right-of-way conditions. Given the missing west-side sidewalks on 14th Street and the unpainted crosswalks, how did you reach that conclusion?" (COB Public Works Standards)
25. 14th and Knox Intersection: "This intersection is a collector route where speeding and ignored stop signs are a known problem. What traffic-calming measures will the school propose for drop-off and dismissal?" (COB Transportation Guidelines)
26. Student Drivers and Parking: "How will the school manage student driving and street parking as enrollment grows and upperclassmen are admitted?" (BMC Traffic Safety Regulations)
6. Noise and Lighting
27. Acoustical Modeling: "Has the school performed a formal acoustical engineering study to measure projected decibel levels at the nearest residential property lines during peak drop-off, recess, and activity hours?" (BMC noise regulations)
28. Daily Noise Limits: "How will bells, outdoor PE, and idling vehicles stay within the residential daytime limit of 60 dBA, including the short-term exceedance caps?" (BMC noise regulations, Class A residential limits)
29. Lighting Plan: "Will the school submit a photometric lighting plan showing foot-candle levels at the property lines, so neighbors can see how much light reaches their homes?" (BMC lighting standards; Policy LU-7)
30. Fixture Shielding: "Will all security and parking lights be fully shielded, dark-sky-compliant fixtures?" (BMC lighting standards)
7. Outdoor Space and Student Wellbeing
31. Physical Education Requirements: "How will the school meet state PE graduation requirements and daily wellness time with no outdoor space on site? What is the plan for bad weather, when indoor space is needed?" (State standards for private schools)
32. Recess and Off-Site Use: "If students use nearby parks, streets, or sidewalks for PE and recess, what agreements are in place with the City or neighbors, and who carries the liability?" (BMC 20.16.010; SEPA)
8. Public Safety and Liability
33. Emergency Vehicle Access: "How will fire trucks and ambulances reach the site during peak drop-off and pick-up on 14th Street and Knox Avenue?" (International Fire Code; COB Engineering Standards)
34. Signage: "Will the school add signs, especially lighted ones, near the intersection? How will you keep them from distracting drivers?" (BMC sign regulations)
35. City and Neighborhood Liability: "Given narrow streets, missing sidewalks, and nearby elementary school congestion, how will the school address the added safety risk for the neighborhood and the City?" (BMC Public Safety and Welfare Standards)
9. Temporary vs. Permanent Plans
36. The "Temporary" Timeline: "What guarantees can you offer that a three-year temporary facility won't become indefinite if a permanent site for 200 or more students is delayed?" (BMC Chapter 20.16)
37. Permanent Construction at Sacred Heart: "Will the Archdiocese commit today to taking Sacred Heart off the table for any permanent school of 200 or more students?" (BMC Title 20)
38. Variances for a Permanent School: "If Sacred Heart is still considered for a permanent school, what zoning variances, height exemptions, or lot-coverage waivers would be needed?" (BMC Title 20)
10. Community Engagement and Alternatives
39. Alternative Sites: "Which commercial or institutional properties in Bellingham did you evaluate, and why were they rejected before choosing a residential neighborhood?" (PSRC school siting guidance)
40. Neighborhood Input: "You plan to apply for a conditional use permit after tonight's meeting. What steps will you take to bring neighborhood feedback into your application before it is submitted?" (BMC Type III-A process requirements)
Comments